Summary
Project consists of connecting to the existing waterline at the north side of 500 north (state highway 191) at 1700 west. The new 8-inch hdpe waterline will be bored under the highway to the south side and then laid parallel to the highway toward the intersection of 1500 west and 500 north, where it will cross under the steinaker service canal and connect to the existing waterline at 1500 west. Existing service connections along the north side of the highway will be connected to the new waterline through additional borings under the highway. Service lines between the new meter and the existing homes will be reconfigured.