Illinois Department of Transportation
State AgencyIL
Posted
-
Nov 6, 2026
116-76T92 - 7.6 Miles of Resurfacing and ADA improvements RFP
7.6 Mi. of Resurfacing and ADA improvements. Approx. 45 SY erosion control blanket; 160 SY stone riprap, class A4; 111,760 P bituminous materials (tack coat); 13,072 ft saw cuts; 100 CY structure excavation; 70 ft precast concrete box culverts 7 LF x 6 LF; 1 EA manholes, type A, 4 LF-diameter, type 3 frame and grate; 34,285 ft short term pavement marking. See outside link.
