Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Massachusetts Division of Marine Fisheries (Department of Fish and Game) is soliciting bids to replace the roof at the Annisquam River Marine Station located at 30 Emerson Ave., Gloucester, MA. The work involves removal of the existing roofing and installation of a new roofing system; bidders must meet state requirements (DCAMM certification), provide required insurance, and submit a 5% bid deposit. The solicitation was posted 2026-01-21 and bids are due 2026-03-11 at 12:00 PM local time, with contract performance generally to be completed by mid-2026 per the project notice.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacing a roof on the back T-Lab.
Posted Date
Jan 21, 2026
Due Date
Mar 11, 2026
Release: Jan 21, 2026
Close: Mar 11, 2026
Replacing a roof on the back T-Lab.
AvailableSingle construction contract for the roof replacement project including demolition and all work.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Single construction contract for the roof replacement project including demolition and all work.
AvailableContractor shall provide all labor, supervision, material, tools, equipment, supplies, transportation, and incidentals necessary to remove old roo ng and to install new standing seam metal roof, as well as all other roo ng components. Replace damaged gutter sections/fasteners with like material, shape, and size. The work breakdown is not all inclusive and other work may be required to achieve an acceptable level of workmanship for the roof replacement/repair. If additional work or repairs are required not include in this statement of work, you must address it during the open question period. All products shall: Remove and properly dispose of existing roofing materials. There are approximately 18 squares of roof surface. Replace rotted roof rafters. All exposed material will be primed and painted to match existing color. See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
Roof Replacement.
Posted Date
Jan 20, 2026
Due Date
Feb 19, 2026
Release: Jan 20, 2026
Close: Feb 19, 2026
Roof Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Contractor shall provide all labor, supervision, material, tools, equipment, supplies, transportation, and incidentals necessary to remove old roo ng and to install new standing seam metal roof, as well as all other roo ng components. Replace damaged gutter sections/fasteners with like material, shape, and size. The work breakdown is not all inclusive and other work may be required to achieve an acceptable level of workmanship for the roof replacement/repair. If additional work or repairs are required not include in this statement of work, you must address it during the open question period. All products shall: Remove and properly dispose of existing roofing materials. There are approximately 18 squares of roof surface. Replace rotted roof rafters. All exposed material will be primed and painted to match existing color. See attached file.