Summary
Construction of approx. 12,235 LF of 12" ductile iron water main and appurtenances, including about 20 service connections to water mains, and road/site restoration. Work consists of water main installation with valves, fire hydrants, fittings and water services, including: a. approx. 12,000 LF of 12" water main generally along Township and State (PennDOT) roads, b. approx. 235 LF of 8" water main extending from the 12” water transmission mains, c. associated fittings, valves and fire hydrants, d. water main crossings of the Pine Run stream and Texas Eastern gas mains, e. about 20 service connections to water mains, and f. road/site restoration.