Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Northbrook School District 28 is soliciting bids from general contractors to construct a new 91,000 square foot Meadowbrook Elementary School to be connected to the existing gymnasium. The work includes demolition of the existing school, underground stormwater detention, utility connections, and sitework with a steel‑frame structural system. A mandatory pre‑bid meeting is scheduled for January 20, 2026, and bids are due February 10, 2026 at 4:00 PM CST at the District Office.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
Posted Date
Jan 10, 2026
Due Date
Feb 2, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 2, 2026
Construction of new modular classroom buildings with associated site work and ada improvements. Construction of a wood framed building, concrete slab alteration, hollow metal doors & frames. The interior building components include electrical, data, fire alarm, hvac, air balance, plumbing, drywall, insulation, frp, paint, casework and countertops, acoustical t-bar ceilings, & lvp flooring, epoxy flooring, toilet accessories and partitions, window shades / coverings, and signage. The sitework includes site demolition, earthwork / grading, underground utilities, playground structures, shade structures, rubberized surface materials, septic tank installation, retention systems, site concrete, modular concrete foundations, electrical infrastructure.
AvailableProject consists of new construction.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Project consists of new construction.
AvailableConstruction of new sidewalk for the park.
Posted Date
Jan 14, 2026
Due Date
Feb 2, 2026
Release: Jan 14, 2026
Close: Feb 2, 2026
Construction of new sidewalk for the park.
AvailableVSU Student Union New Construction.
Posted Date
Jan 14, 2026
Due Date
Jan 20, 2026
Release: Jan 14, 2026
Close: Jan 20, 2026
VSU Student Union New Construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →