Retrieving RFP details
Release
Close
Oxnard Harbor District
The work consist of, but is not limited to, installation of electrical infrastructure and electrical-grid-base connection allowing roll-on/roll-off ocean going vessels to shut down auxiliary engines while at berth and connect into shore power. In addition, all other work necessary and required including, but not limited to, work shown on drawings and associated specifications and as required for a complete and operational system as intended by the contract documents.
Oxnard Harbor District
Provide construction management services for two projects under a single contract: the north and south terminal shore power project.
Alaska Department of Transportation and Public Facilities
Resurface North Tongass from the Airport Ferry Terminal (milepoint 0.717) to (and including) the Ward Coveÿ(milepoint 4.485). Replace culverts and guardrail at the end of useful life. Correct erosion and clear brush at Cannery Creek Bridge No. 746.
Seminole County
Provide one new terminal tractor.
Release
Jun 04, 2025
Close
Nov 14, 2025