Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of, but is not limited to, installation of electrical infrastructure and electrical-grid-base connection allowing roll-on/roll-off ocean going vessels to shut down auxiliary engines while at berth and connect into shore power. In addition, all other work necessary and required including, but not limited to, work shown on drawings and associated specifications and as required for a complete and operational system as intended by the contract documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes installation of electrical infrastructure and electrical-grid-base connection allowing container ocean going vessels to shut down auxiliary engines while at berth and connect into shore power.
Posted Date
Dec 5, 2025
Due Date
Jan 27, 2026
Release: Dec 5, 2025
Close: Jan 27, 2026
Work includes installation of electrical infrastructure and electrical-grid-base connection allowing container ocean going vessels to shut down auxiliary engines while at berth and connect into shore power.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for roofing upgrades at North Shore Senior High School, North Shore Senior High 10th Grade Center, and Cobb Sixth Grade Campus.
Posted Date
Jan 4, 2026
Due Date
Jan 22, 2026
Release: Jan 4, 2026
Close: Jan 22, 2026
This RFP is for roofing upgrades at North Shore Senior High School, North Shore Senior High 10th Grade Center, and Cobb Sixth Grade Campus.
AvailableSeaport intends to award one (1) Professional Services Agreement (PSA) for Shore Power Operations and Maintenance. The Consultant shall provide non-exclusive professional services, overseeing daily operations to ensure safe, reliable, and efficient shore power connections. Responsibilities also include verifying the accuracy and currency of operational and maintenance records (as maintained by the Operator), coordinating and supporting troubleshooting and repair activities, and immediately reporting any irregularities, unsafe conditions, or system anomalies to the Seaport Operations Department.
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Seaport intends to award one (1) Professional Services Agreement (PSA) for Shore Power Operations and Maintenance. The Consultant shall provide non-exclusive professional services, overseeing daily operations to ensure safe, reliable, and efficient shore power connections. Responsibilities also include verifying the accuracy and currency of operational and maintenance records (as maintained by the Operator), coordinating and supporting troubleshooting and repair activities, and immediately reporting any irregularities, unsafe conditions, or system anomalies to the Seaport Operations Department.
AvailableDESIGN-BUILD: Design and construction of decarbonization measures at the north shore community college (nscc) danvers campus. The project seeks to implement enclosure envelope, mechanical, electrical, and plumbing (mep), and efficiency energy conservation measures (ecms), in order to align the campus with massachusetts 2050 decarbonization goals.
Posted Date
Dec 18, 2025
Due Date
Feb 12, 2026
Release: Dec 18, 2025
Close: Feb 12, 2026
DESIGN-BUILD: Design and construction of decarbonization measures at the north shore community college (nscc) danvers campus. The project seeks to implement enclosure envelope, mechanical, electrical, and plumbing (mep), and efficiency energy conservation measures (ecms), in order to align the campus with massachusetts 2050 decarbonization goals.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →