Summary
The Great Lakes Water Authority (GLWA) is soliciting construction services for the North Service Center Pumping Station Improvements (CIP #132016), a major rehabilitation project with an estimated construction cost of approximately $108,322,551. The work scope described in GLWA materials includes electrical upgrades (switchgear, variable drives, unit substation, excitation systems), mechanical replacements (multiple pumps and 2,500 hp motors), piping and valve replacements, and control system integrations to improve reliability and operational flexibility. GLWA manages solicitation and document distribution through its procurement channels and has planned multi-year design and construction activity for the project (design/assistance contracts and long completion horizon are reflected in GLWA board materials).