Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Drainage issue on East side of new gym. Dig land drain approx. 100' x 6' deep and tie into the existing storm drain system also remove approx. 100 x 5' sidewalk (1/2 width) of sinking sidewalk and re-pour with proper slope. Possibly add land drain along the building and also tie into existing land drain. BID- Tear out and replace existing sidewalk on east side of gym wall, add land drain along the gym wall and east of the current sidewalk, tie in land drains to existing storm drain. Proper sub-soils will need to be added and compacted before sidewalk is poured. Excavation will be approx. 60' L X 25' W x 6' D Contractor will need to access the site from the North side of property. No dump truck access will be allowed on the East side of the property. Contractor to haul off all unused soil along with concrete and repair/replace sod as needed. Foundation water proofing will need to be verified and added as needed. Add trough drain at bottom of stairway along North side gym wall and tie into existing storm drain. Sika flex all seems or cracks in current sidewalk/stairway .
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
North base concrete repair.
Posted Date
Oct 30, 2025
Due Date
Dec 12, 2025
Release: Oct 30, 2025
Close: Dec 12, 2025
North base concrete repair.
ADA Risk management report Replace cracked and damaged concrete panels East side of main entry, East side sidewalk near portables and seminary entrance.
Posted Date
Dec 9, 2025
Due Date
Dec 18, 2025
Release: Dec 9, 2025
Close: Dec 18, 2025
ADA Risk management report Replace cracked and damaged concrete panels East side of main entry, East side sidewalk near portables and seminary entrance.
AvailableThe Consultant shall provide Drainage Asset Inventory & Inspection Services.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
The Consultant shall provide Drainage Asset Inventory & Inspection Services.
AvailableBeaverton School District #48J is issuing an RFQ to shortlist design-build teams for the Barnes Elementary School Gym and Cafeteria project ahead of a subsequent RFP. The procurement is a competitive sealed process with a mandatory pre-qualification conference on November 19, 2025.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Beaverton School District #48J is issuing an RFQ to shortlist design-build teams for the Barnes Elementary School Gym and Cafeteria project ahead of a subsequent RFP. The procurement is a competitive sealed process with a mandatory pre-qualification conference on November 19, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis