Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work generally consists of construction of a new 8,600 SF three bay fire station with support offices, training room and kitchen. The facility will be a pre-engineered metal building construction on a concrete foundation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Fire Training Facility Window Replacement Project.
Posted Date
Dec 20, 2025
Due Date
Jan 8, 2026
Release: Dec 20, 2025
Close: Jan 8, 2026
Provide Fire Training Facility Window Replacement Project.
AvailablePremium
Access the largest public sector contact database
Purchase of new rescue tools for the ruston fire department.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Close: Dec 16, 2025
Purchase of new rescue tools for the ruston fire department.
AvailableConstruction of a new live fire training facility. The Fire Rescue live fire training facility shall be a 3 story structure erected from (11) New (One Trip) shipping containers. Due to site constraints and existing septic lines, the overall footprint of the structure will have to be built in an (L) shape to maximize the facilities’ function. The short side of the L shape will consist of (6) containers stacked (3) base, (2) second story, (1) third story and measure 40 feet from end to end. The long side of the L shape will consist of (5) containers, joined perpendicular to the short side, (3) base, (2) second floor, and measure 66 feet from end to end. The interior of the containers will be modified to simulate the interior of a residential structure.
Posted Date
Nov 6, 2025
Due Date
Jan 2, 2026
Release: Nov 6, 2025
Close: Jan 2, 2026
Construction of a new live fire training facility. The Fire Rescue live fire training facility shall be a 3 story structure erected from (11) New (One Trip) shipping containers. Due to site constraints and existing septic lines, the overall footprint of the structure will have to be built in an (L) shape to maximize the facilities’ function. The short side of the L shape will consist of (6) containers stacked (3) base, (2) second story, (1) third story and measure 40 feet from end to end. The long side of the L shape will consist of (5) containers, joined perpendicular to the short side, (3) base, (2) second floor, and measure 66 feet from end to end. The interior of the containers will be modified to simulate the interior of a residential structure.
AvailableThe Town of Erie is soliciting design services for improvements to the North Water Reclamation Facility, including construction of sampling and flow measurement structures, road construction, telemetry, new pumps, HVAC and blower upgrades, and a second mechanical bar screen. The consultant will provide preliminary and final design, bidding phase, and construction phase services and must comply with applicable environmental regulations.
Posted Date
-
Due Date
Dec 20, 2025
Close: Dec 20, 2025
The Town of Erie is soliciting design services for improvements to the North Water Reclamation Facility, including construction of sampling and flow measurement structures, road construction, telemetry, new pumps, HVAC and blower upgrades, and a second mechanical bar screen. The consultant will provide preliminary and final design, bidding phase, and construction phase services and must comply with applicable environmental regulations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis