Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of a new 20200 SF middle school on existing fields and demolished gymnasium. Split level steel framed, load bearing masonry building with brick veneer and metal panel exterior. Bid packages include: 0240-demo/abatement, 0300-concrete; 0310-concrete foundations; 0320-concrete slabs; 0500-struct. /misc. Steel; 1410-elevator; 2100-fire protection; 2200-plumbing; 2300-hvac; 2600-electrical; 3100-turnkey site; 3110-grading; 3210-asphalt paving; 3300-utilities. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction services for the remodel of North Sevier Middle School's entry to create a secure entrance and additional office space.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Construction services for the remodel of North Sevier Middle School's entry to create a secure entrance and additional office space.
AvailableCompetitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
Posted Date
Dec 7, 2025
Due Date
Jan 12, 2026
Release: Dec 7, 2025
Close: Jan 12, 2026
Competitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
Work includes: HVAC Upgrades at Cunningham Middle School: Controls upgrade, replace 4 AHU's, Replace DX Coil & Condenser, install 13 VFD’s and replace 6 hydronic cooling system pumps. North Shore Middle School roof restoration: install a flute fill ISO, coverboard, and 60mil. felt back PVC roof system with decor ribs to simulate standing seam, new gutters, downspouts, and associated metal, minor repairs to coping cap at low slope roof areas. Cunningham roof restoration: cap new modified bitumen over existing roof membrane and associated metal. Both roofs to extend 20 year NDL warranty.
Posted Date
Dec 7, 2025
Due Date
Jan 15, 2026
Release: Dec 7, 2025
Close: Jan 15, 2026
Work includes: HVAC Upgrades at Cunningham Middle School: Controls upgrade, replace 4 AHU's, Replace DX Coil & Condenser, install 13 VFD’s and replace 6 hydronic cooling system pumps. North Shore Middle School roof restoration: install a flute fill ISO, coverboard, and 60mil. felt back PVC roof system with decor ribs to simulate standing seam, new gutters, downspouts, and associated metal, minor repairs to coping cap at low slope roof areas. Cunningham roof restoration: cap new modified bitumen over existing roof membrane and associated metal. Both roofs to extend 20 year NDL warranty.
CAT 1 WAN connections for Highlands Middle School: CAT 1 Data Transmission (WAN) add location to existing WAN network.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
CAT 1 WAN connections for Highlands Middle School: CAT 1 Data Transmission (WAN) add location to existing WAN network.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis