Retrieving RFP details
Release
Close
North Benton Water Association
Project consist of contract A: provide materials for a working amr system with drive by data collection and approximately 185 radio read meters. Contract B: replace approximately 185 radio read meters provided by contract A. Contract C: install approximately 31 gate valves at existing hydrants. Contract D: install 200 gpm ground water well (approximately 1,350' Deep). Includes yard piping, chemical feed systems, electrical, control system improvements, and an alternate for a portable generator. See outside link.
Upton Housing Authority
Provide new fire alarm system installation.
City of Anderson
Work consists of, general conditions, bonds, and insurances, max. 5% 1 LS; construction staking 1 LS; rock excavation 150 CY; pre-construction video survey 1 LS; surface restoration and landscaping restoration 1 LS; maintaining traffic 1 LS; erosion control and storm water management 1 LS; tree, remove, 6" to 18" 3 EA; tree, remove, 19" to 36" 14 EA; tree, remove, greater than 36" 2 EA; cold mill and overlay, HMA, type B, 1.5" 29235 SY; cut & cap existing water main 18 EA; hydrant, remove 30 EA; gate valve, abandon 48 EA; water service, abandon 30 EA; undercutting and backfill 300 CY; water main, 4" 21 LF; water main, 6" 202 LF. See attached file.
City of Anderson
Work includes general conditions, bonds, and insurances, max 5% 1 LS; rock excavation 50 SY; pre-construction video survey 1 LS; surface restoration and landscaping restoration 1 ls; maintaining traffic 1 LS; erosion control and storm water management 1 LS; cold mill and overlay, HMA, type B, 1.5" 17,475 SY; storm sewer, remove 20 LF; cut & cap existing water main 14 EA; hydrant, remove 7 EA; gate valve, abandon 12 EA; water service, abandon 8 EA; undercutting and backfill 100 CY; water main, 6" 365 LF; water main, 8" 12,635 LF; water main, 8", HDD 280 LF; protective casing, 12" 330 LF; gate valve & box, 6" 2 EA; gate valve & box, 8" 64 EA. See attached file.
Village of College Corner
Critical storm sewer, water & curb project.
Release
Oct 08, 2024
Close
Nov 05, 2024