Summary
Re-advertisement for elevators contractor request for qualifications.
Work includes construction of a new high school, a 3-story, 226,740 GSF building for 1025 students in grades 9- 12. The new building will be located to the south of the existing school and will target net-zero ready construction and leed gold. Athletic fields, site circulation and parking will be located in the location of the demolished hs. Early site enabling trade contractor scopes include blind-side belowslab waterproofing, (1) passenger elevator and a vertical platform lift, and the primary duct bank serving multiple locations including the primary refeeding the relocated stadium equipment, and the secondary and fiber duct banks into the building.