This project primarily consists of roadway and drainage improvements. Roadway improvements include complete reconstruction of the existing paved roadway with the addition of concrete shoulder gutter along both sides and new concrete driveways and isolated sections of concrete sidewalk replacement. Drainage improvements consist of replacement and upsizing of existing stormwater culverts along with the addition of concrete end treatments and concrete drainage inlets. Signing and pavement markings are also included with thermoplastic striping being placed on the final asphalt surface. This project also includes utility relocations to facilitate the new drainage improvements. Utility relocations consist of 8" water main, fire hydrants, water services, utility valve and manhole adjustments, and 2" to 2. 5" natural gas mains relocated with welded steel gas pipe.