Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide bank stabilization & ppc rip rap. The repair work will include the excavation of sediment from below the mean high-water line (temporarily stockpiled), removal of the twisted-wire gabion baskets and associated stone, and placement of the rock mattresses. Grade will be met with additional riprap stone, the existing gabion stone, and sand, where applicable. After the armoring has been completed, the site will be stabilized and planted. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide clendening rip-rap supply. 2200 TN.
Posted Date
Jan 8, 2026
Due Date
Jan 26, 2026
Release: Jan 8, 2026
Close: Jan 26, 2026
Provide clendening rip-rap supply. 2200 TN.
AvailableThe improvements will consist of compacted fill, dredging of harbor and placement of rip-rap and appurtenances.
Posted Date
Jan 15, 2026
Due Date
Feb 11, 2026
Release: Jan 15, 2026
Close: Feb 11, 2026
The improvements will consist of compacted fill, dredging of harbor and placement of rip-rap and appurtenances.
AvailableEngineering design and permitting services for flood mitigation and bank stabilization along the Passaic River at Daniel Morris Park, including bulkhead and other site improvements.
Posted Date
Jan 20, 2026
Due Date
Feb 10, 2026
Release: Jan 20, 2026
Close: Feb 10, 2026
Engineering design and permitting services for flood mitigation and bank stabilization along the Passaic River at Daniel Morris Park, including bulkhead and other site improvements.
AvailableThis RFP is for drainage ditch bank stabilization improvements, including grading, erosion control, stabilization material installation, and vegetation.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
This RFP is for drainage ditch bank stabilization improvements, including grading, erosion control, stabilization material installation, and vegetation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis