CountyGA
Posted
Oct 15, 2026
Nov 23, 2026
Description: Construction improvements to Duane Street in the Borough of Jamesburg, New Jersey.
City · NJ, US
Decision makers connected to this RFP from Borough of Jamesburg.
Adjacent opportunities open for bidding right now.
CountyGA
Posted
Oct 15, 2026
Nov 23, 2026
Street and drainage improvements.
CityCA
Posted
Nov 12, 2026
Nov 30, 2026
The work to be done consists of furnishing all labor, materials, tools, equipment, and incidentals necessary for rehabilitation of Goodrich Boulevard, East Olympic Boulevard, Corsair Street, Elm Street, Condor Street, Bandini Boulevard, Eastern Avenue, Atlantic Boulevard, Cowlin Avenue, Yates Avenue, and Slauson Avenue within the limits shown on the Project Plans. Work includes AC cold milling and overlay, asphalt rubber hot mix, localized AC pavement repair, PCC pavement surface preparation and overlay, slurry seal, curb ramps and detectable warning surfaces, drainage improvements, utility adjustments, traffic loop replacement, and removal and restoration of signing, striping, markings, and pavement markers, together with traffic control and associated work.
CityLA
Posted
-
Nov 24, 2026
Project consists of engineering & construction for milling, base construction, and overlaying the existing city street for its entire length. 201 SY removal of asphalt drives; 122 LF removal of concrete combination curb & gutter; 954 SY removal of concrete walks and drives; 517 SY removal of incidental concrete paving; 105 LF cleaning existing ditches; 334.5 TN asphalt concrete. See attached file.
CityTX
Posted
Nov 5, 2026
Nov 24, 2026
The full-depth reconstruction of approximately 1,600 linear feet of existing roadway, beginning at its intersection with Judge Ely Boulevard and extending westward along Hailey Street. Improvements include the removal and disposal of existing hot mix asphalt pavement, roadway base material, and concrete curb and gutter, followed by preparation and lime stabilization of the underlying subgrade. The proposed roadway section will consist of 7 inches of flexible base material, new concrete curb and gutter, and hot mix asphalt pavement in accordance with the construction plans and specifications. Construction activities shall include necessary grading, compaction, and adjustments to existing improvements to accommodate the proposed roadway elevations and drainage patterns. The Contractor shall coordinate construction sequencing and maintain reasonable access to adjacent properties throughout the project, minimizing disruptions to existing property owners to the extent practical. The project will also require coordination with AEP Texas for overhead electrical utility pole adjustments or relocations, with such utility work to be performed by AEP Texas. The Contractor shall coordinate its construction schedule with the required utility work to minimize conflicts and facilitate timely completion of the roadway improvements.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval