South Dakota Department of Transportation
State AgencySD
Posted
Oct 9, 2026
Nov 4, 2026
NH-P 0033(47) (PCN 09VE) - Pipe Work RFP
Approx. 102 CY Unclassified Excavation; 1 LS Remove and Replace Topsoil; 18 LF 48" RCP Class 3, Furnish; 18 LF 48" RCP, Install; 1 EA 48" RCP Flared End, Furnish; 1 EA 48" RCP Flared End, Install; 304 Ton Class C Riprap; 1 LS Erosion Control. See attached file.
