Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
New Thurston (Finishes & Low Voltage).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Apr 13, 2021
Close: May 31, 2026
Annual low voltage contract.
AvailablePremium
Access the largest public sector contact database
Provide urgent, on-call as needed electrical low -voltage (600 volts and below) services for the buildings identified in exhibit a, attachment 1, service locations. Services shall include the following: evaluate and diagnose, repair and replace, test and inspect, report of findings.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
Provide urgent, on-call as needed electrical low -voltage (600 volts and below) services for the buildings identified in exhibit a, attachment 1, service locations. Services shall include the following: evaluate and diagnose, repair and replace, test and inspect, report of findings.
AvailableWork that include alternations, repairs, and construction. 1. Underground duct bank and maintenance hole (MH) installation. 2. Outside plant (OSP) copper telephone cabling, and fiber optic cabling, including the splicing and termination of outside plant copper and fiber optic cables, and the testing of each copper cable pair and fiber optic strands. 3. Structured cabling, copper/fiber optic/coax riser cabling and facilities, voice/data/TV outlets, plus telecom room and server room build outs and associated sub systems. See attached file for full scope.
Posted Date
Nov 25, 2025
Due Date
Jan 5, 2026
Release: Nov 25, 2025
Close: Jan 5, 2026
Work that include alternations, repairs, and construction. 1. Underground duct bank and maintenance hole (MH) installation. 2. Outside plant (OSP) copper telephone cabling, and fiber optic cabling, including the splicing and termination of outside plant copper and fiber optic cables, and the testing of each copper cable pair and fiber optic strands. 3. Structured cabling, copper/fiber optic/coax riser cabling and facilities, voice/data/TV outlets, plus telecom room and server room build outs and associated sub systems. See attached file for full scope.
AvailableRegulator, voltage, NSN: 6110-01-219-3445HY.
Posted Date
Jun 24, 2025
Due Date
Jun 24, 2026
Release: Jun 24, 2025
Close: Jun 24, 2026
Regulator, voltage, NSN: 6110-01-219-3445HY.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis