Summary
To provide turnkey design, demolition, site preparation, installation, and project management services for the replacement of the existing playground and surrounding play area located on the new london elementary school campus. The selected contractor shall be responsible for managing all aspects of the project, including design, site preparation, demolition, drainage improvements, accessibility compliance, equipment procurement and installation, site improvements, and landscaping. The goal of this project is to construct a safe, modern, inclusive, and durable playground environment capable of supporting approx 60 70 students simultaneously for grades kindergarten through grade 5.