Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Edgartown
Filed sub-bid contractor bids for the electrical trade. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Navajo Tribal Utility Authority (NTUA)
Seeks for firewall and switches for electrical operations.
Posted Date
Sep 3, 2025
Due Date
Nov 21, 2025
Release: Sep 3, 2025
Navajo Tribal Utility Authority (NTUA)
Close: Nov 21, 2025
Seeks for firewall and switches for electrical operations.
AvailableJacksonville Port Authority - Procurement
Provide materials, equipment, incidentals, testing, bypassing, and supervision necessary for the removal of all existing equipment, modifications, and upgrades to the terminal phase c lift station. Existing concrete slab over the wet well will be saw cut and retrofitted with a hinged locking aluminum access lid and frame capable of supporting pedestrian loads of 150psf minimum; sized appropriately for the rail system, access, removal, and service of the submersible pumps, wet well, and components. See attached file.
Posted Date
Apr 20, 2023
Due Date
Nov 24, 2025
Release: Apr 20, 2023
Jacksonville Port Authority - Procurement
Close: Nov 24, 2025
Provide materials, equipment, incidentals, testing, bypassing, and supervision necessary for the removal of all existing equipment, modifications, and upgrades to the terminal phase c lift station. Existing concrete slab over the wet well will be saw cut and retrofitted with a hinged locking aluminum access lid and frame capable of supporting pedestrian loads of 150psf minimum; sized appropriately for the rail system, access, removal, and service of the submersible pumps, wet well, and components. See attached file.
Grundy County
Electrical layout for low voltage bid.
Posted Date
Oct 15, 2025
Due Date
Nov 20, 2025
Release: Oct 15, 2025
Grundy County
Close: Nov 20, 2025
Electrical layout for low voltage bid.
City of Barnstable
The Town of Barnstable is soliciting sub‑bids for electrical work associated with the School Administration Building Phase 2 Mechanical Project, which includes elevator replacement, heating system pipe replacement, and fan coil unit replacement. The contractor must furnish all labor, materials, and equipment and coordinate four project phases.
Posted Date
Nov 6, 2025
Due Date
Dec 3, 2025
Release: Nov 6, 2025
City of Barnstable
Close: Dec 3, 2025
The Town of Barnstable is soliciting sub‑bids for electrical work associated with the School Administration Building Phase 2 Mechanical Project, which includes elevator replacement, heating system pipe replacement, and fan coil unit replacement. The contractor must furnish all labor, materials, and equipment and coordinate four project phases.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis