Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a new AVGAS fueling system. Major elements of work for the project include but are not limited to the construction of an AVGAS fueling system equipment pad and concrete foundations, asphalt paving improvements, drainage improvements, electrical improvements, and manufacturer, installation, and commissioning of new AVGAS fueling equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
1 LS of AVGAS System Upgrades. 1 LS of New Jet A Self-Service System.
Posted Date
Dec 7, 2025
Due Date
Dec 16, 2025
Release: Dec 7, 2025
Close: Dec 16, 2025
1 LS of AVGAS System Upgrades. 1 LS of New Jet A Self-Service System.
AvailablePremium
Access the largest public sector contact database
Work includes replacing the aged water main and service lines within the Housing and Administrative area above Bat Cave Draw. The work involves installing approx. 1000 FT of 8 HDPE, 30 FT of 6 HDPE, 1650 FT of 4 HDPE watermain, 1010 FT of 2 HDPE, 430 FT of 3/4 HDPE service lines, fittings, installing five 8" gate valves, four 6" gate valves, and nine 4" gate valves, two new fire hydrant assemblies, replacing two existing fire hydrant assemblies, and replacing and burying the service line behind the Bat Flight Draw comfort station. Work includes soil borings, rock trenching, replacing hardscape, revegetation, capping the existing waterlines for abandonment in place after the new line is put into service, and removal of the existing hydrants to be replaced in place.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Work includes replacing the aged water main and service lines within the Housing and Administrative area above Bat Cave Draw. The work involves installing approx. 1000 FT of 8 HDPE, 30 FT of 6 HDPE, 1650 FT of 4 HDPE watermain, 1010 FT of 2 HDPE, 430 FT of 3/4 HDPE service lines, fittings, installing five 8" gate valves, four 6" gate valves, and nine 4" gate valves, two new fire hydrant assemblies, replacing two existing fire hydrant assemblies, and replacing and burying the service line behind the Bat Flight Draw comfort station. Work includes soil borings, rock trenching, replacing hardscape, revegetation, capping the existing waterlines for abandonment in place after the new line is put into service, and removal of the existing hydrants to be replaced in place.
AvailableThe County of El Dorado is seeking proposals for the installation of a new Automated Weather Observing System (AWOS) on the existing tower at Placerville Airport. Bidders must comply with Attachment A (Specifications) and Attachment C (Construction Plans) and submit proposals as per contract instructions. The estimated value range for this project is $200,000–$500,000, with the posting hosted on QuestCDN.
Posted Date
Dec 8, 2025
Due Date
Mar 31, 2026
Release: Dec 8, 2025
Close: Mar 31, 2026
The County of El Dorado is seeking proposals for the installation of a new Automated Weather Observing System (AWOS) on the existing tower at Placerville Airport. Bidders must comply with Attachment A (Specifications) and Attachment C (Construction Plans) and submit proposals as per contract instructions. The estimated value range for this project is $200,000–$500,000, with the posting hosted on QuestCDN.
AvailableInstall new automated weather observing system on existing tower.
Posted Date
Dec 8, 2025
Due Date
Mar 31, 2026
Release: Dec 8, 2025
Close: Mar 31, 2026
Install new automated weather observing system on existing tower.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis