Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new AVGAS fueling system, including site development, equipment installation, and commissioning at Illinois Valley Airport.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a new AVGAS fueling system. Major elements of work for the project include but are not limited to the construction of an AVGAS fueling system equipment pad and concrete foundations, asphalt paving improvements, drainage improvements, electrical improvements, and manufacturer, installation, and commissioning of new AVGAS fueling equipment.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
Construct a new AVGAS fueling system. Major elements of work for the project include but are not limited to the construction of an AVGAS fueling system equipment pad and concrete foundations, asphalt paving improvements, drainage improvements, electrical improvements, and manufacturer, installation, and commissioning of new AVGAS fueling equipment.
AvailableOne new 12,000-gallon Jet A tank and one new 12,000-gallon Avgas tank with a new credit card reader, bollards, and electrical equipment on a new concrete pad. Furnish and install new underground electrical duct and communication cable and a new fence around the new fuel island. Construct concrete containment pad for fuel tanker parking during fuel offloading and a sump pump and oil-water separator. Construct new asphalt pavement entrance to concrete containment pad.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
One new 12,000-gallon Jet A tank and one new 12,000-gallon Avgas tank with a new credit card reader, bollards, and electrical equipment on a new concrete pad. Furnish and install new underground electrical duct and communication cable and a new fence around the new fuel island. Construct concrete containment pad for fuel tanker parking during fuel offloading and a sump pump and oil-water separator. Construct new asphalt pavement entrance to concrete containment pad.
AvailableThis project involves modifying a 12,000-gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled.
Posted Date
Dec 18, 2025
Due Date
Jan 14, 2026
Release: Dec 18, 2025
Close: Jan 14, 2026
This project involves modifying a 12,000-gallon jet fuel (F-24) horizontal aboveground storage tank and the surrounding fueling area. The tank work includes installing a sampling/gauging hatch on a tank manway, installing a clock type mechanical gauge on another manway, recoating the exterior of the tank, replacing collision barriers, adding a catwalk that extends the entirety of the tank, and replacing the audible and visual alarms. The remote containment basin drainage pipe shall be repaired and sloped positively to the drain inlet/manhole direction. The asphalt near the fueling facility shall be replaced to allow better storm water drainage. The refueler parking concrete shall also be replaced. The dispenser fuel monitor shall be replaced by a non-coalescing filter and a hand pumped water draw off system shall be installed as well. Near the truck offload area, some asphalt is getting replaced with concrete to prevent the degradation of the asphalt when fuel is spilled.
AvailableProposals are requested for CNG Fueling Building Expansion Construction.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
Proposals are requested for CNG Fueling Building Expansion Construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →