Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation and addition to the 800 S.F. (+/-) Wilder Memorial Library. The addition will be 1300 S.F. (+/-). Renovations to the existing library include cleaning, cutting, and repointing existing exterior masonry, restoring the existing windows, removing the East brick chimney, adding a new arch-top window on the East Elevation (to match the existing West arch-top window), painting of exterior wood elements, removing and resetting of existing slate roofing, replacing the copper roof valleys and flashing, adding a new mechanical room on the Lower Level, adding a new storage room on the Lower Level, refinishing existing interior wood elements, and adding new interior wood bookshelves (in the main library space) to match existing.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for the construction of a new building addition including a gym, classrooms, and support spaces, sitework, utilities, and targeted improvements to an existing elementary school cafeteria, multi-purpose room, restroom suite, main entry facade, and fire alarm system.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
This RFP is for the construction of a new building addition including a gym, classrooms, and support spaces, sitework, utilities, and targeted improvements to an existing elementary school cafeteria, multi-purpose room, restroom suite, main entry facade, and fire alarm system.
AvailableConstruct additions and alterations for the elementary school. Project consists of the construction of a separate building addition to an existing elementary school containing a gym, classrooms and support spaces. It also includes sitework and utilities associated with the addition, and targeted improvements to the existing school at the cafeteria, multi-purpose room, restroom suite and main entry facade, and fire alarm system upgrades.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
Construct additions and alterations for the elementary school. Project consists of the construction of a separate building addition to an existing elementary school containing a gym, classrooms and support spaces. It also includes sitework and utilities associated with the addition, and targeted improvements to the existing school at the cafeteria, multi-purpose room, restroom suite and main entry facade, and fire alarm system upgrades.
Provide new security connector addition.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
Provide new security connector addition.
AvailableProcurement of new split system direct expansion heat pump systems for multiple locations at Irving Elementary and Danebo Elementary Schools, including refrigerant piping, control/signal wiring, condensate drainage systems, and all necessary electrical upgrades for installation, testing, and commissioning.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
Procurement of new split system direct expansion heat pump systems for multiple locations at Irving Elementary and Danebo Elementary Schools, including refrigerant piping, control/signal wiring, condensate drainage systems, and all necessary electrical upgrades for installation, testing, and commissioning.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis