Retrieving RFP details
Release
Close
Foothills Regional Airport Authority
Work includes new 8-unit t-hangar building.
Luzerne County
Provide two (2) standard pre-engineered 12-unit t-hangar buildings.
Beatrice Airport Authority
Site preparation/mobilization and temporary airport safety measures; Erosion control measures; Removal of existing pavement; Earthwork (excavation, embankment, off-site borrow); Construction of new aggregate base course; Construction of new concrete pavement; Airfield Pavement Marking; Installation of storm sewer system; Topsoil, seeding, and mulching; Installation of new hangar electric service power cabling in conduit; Construction of new 10-Place Nested T-Hangar (231’ Long x 51’ Wide, With 41’-6” x 12’ Clear Opening Bi-Fold Doors).
Chicago-Gary Regional Airport Authority
Work consists of hangar - site work. See outside link.
Release
Oct 23, 2025
Close
Nov 20, 2025