Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply and install a new 16' x 8' intertie vault along with approx. 75 LF of 14" DI waterline, associated fittings, valves and accessories. Work includes coordinating and assisting city of Spokane in reconfiguration of existing piping in and around the existing intertie vault. Remove existing asphalt associated with work and reconstruct asphalt surface.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The scope of improvements includes a new masonry electrical building built on top of an existing booster pump station vault, partial demolition of vault appurtenances, installation of City supplied control and electrical equipment, and other miscellaneous improvements.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
The scope of improvements includes a new masonry electrical building built on top of an existing booster pump station vault, partial demolition of vault appurtenances, installation of City supplied control and electrical equipment, and other miscellaneous improvements.
AvailableThe City of Hawthorne is requesting proposals for a four-year contract to audit its financial statements for the six years beginning with the fiscal year ending June 30, 2026.
Posted Date
Jan 12, 2026
Due Date
Mar 19, 2026
Release: Jan 12, 2026
Close: Mar 19, 2026
The City of Hawthorne is requesting proposals for a four-year contract to audit its financial statements for the six years beginning with the fiscal year ending June 30, 2026.
AvailableWork includes installation of approx 2,600 LF of 1,297 LF 10", 695 LF 12", and 672 LF 16" C900 PVC water transmission pipe, 1 EA 8" gate valve, 1 EA 10" gate valve, 2 EA 16" gate valve, 1 ea of 1" air release valve, striping, pavement removal and replacement.
Posted Date
Sep 3, 2025
Due Date
Feb 10, 2026
Release: Sep 3, 2025
Close: Feb 10, 2026
Work includes installation of approx 2,600 LF of 1,297 LF 10", 695 LF 12", and 672 LF 16" C900 PVC water transmission pipe, 1 EA 8" gate valve, 1 EA 10" gate valve, 2 EA 16" gate valve, 1 ea of 1" air release valve, striping, pavement removal and replacement.
AvailableRehabilitation of asphalt and concrete pavement and curb and gutter repair within the City.
Posted Date
Dec 19, 2025
Due Date
Jan 19, 2026
Release: Dec 19, 2025
Close: Jan 19, 2026
Rehabilitation of asphalt and concrete pavement and curb and gutter repair within the City.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis