Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Collier County, Florida is soliciting sealed bids (Bid No. 26-8637) for the NE-LTA09 Surface Facilities Project to construct surface facilities at the SE corner of Big Corkscrew Island Regional Park in Naples, FL. A non-mandatory pre-bid meeting is scheduled for January 29, 2026 at 10:00 a.m. at 3851 City Gate Drive, Naples, FL 34117 with a site visit to follow. Sealed bids are due February 19, 2026 at 3:00 p.m. local time; documents and vendor registration are available on the Collier County OpenGov procurement portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project involves the construction of a wellhead building for the recently completed ASR No. 4 Well. The building will have four rooms that will house bulk chemical storage, chemical feed equipment, and electrical equipment. In addition to the building construction, ASR wellhead discharge piping and yard piping installation work is required. Lastly, the site requires some civil sitework, which will involve an extension to the existing site driveway.
Posted Date
Dec 10, 2025
Due Date
Jan 29, 2026
Release: Dec 10, 2025
Close: Jan 29, 2026
This project involves the construction of a wellhead building for the recently completed ASR No. 4 Well. The building will have four rooms that will house bulk chemical storage, chemical feed equipment, and electrical equipment. In addition to the building construction, ASR wellhead discharge piping and yard piping installation work is required. Lastly, the site requires some civil sitework, which will involve an extension to the existing site driveway.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes playground safety surface project. Protecting existing vegetation to remain. Removing existing vegetation. Clearing and grubbing. Stripping and removal of topsoil. Removing above- and below-grade site improvements. Disconnecting, capping or sealing, and removing site utilities. Temporary erosion- and sedimentation-control measures.
Posted Date
Jul 21, 2025
Due Date
Feb 3, 2026
Release: Jul 21, 2025
Close: Feb 3, 2026
Work includes playground safety surface project. Protecting existing vegetation to remain. Removing existing vegetation. Clearing and grubbing. Stripping and removal of topsoil. Removing above- and below-grade site improvements. Disconnecting, capping or sealing, and removing site utilities. Temporary erosion- and sedimentation-control measures.
AvailableThis RFP is for the design and application of slurry seal and cape seal surface treatments, re-establishment of pavement markings, and management of associated construction elements for the Moving Montrose Forward 2022 Surface Treatment Project.
Posted Date
Jan 15, 2026
Due Date
Feb 9, 2026
Release: Jan 15, 2026
Close: Feb 9, 2026
This RFP is for the design and application of slurry seal and cape seal surface treatments, re-establishment of pavement markings, and management of associated construction elements for the Moving Montrose Forward 2022 Surface Treatment Project.
AvailableProject consists of restoration of four public stormwater treatment facilities. Various restoration methods may be involved such as vegetation management, regrading, and potential subgrade replacement or surface scarifying to enhance infiltration capabilities and maintain conveyance capacity.
Posted Date
Jan 21, 2026
Due Date
Feb 27, 2026
Release: Jan 21, 2026
Close: Feb 27, 2026
Project consists of restoration of four public stormwater treatment facilities. Various restoration methods may be involved such as vegetation management, regrading, and potential subgrade replacement or surface scarifying to enhance infiltration capabilities and maintain conveyance capacity.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →