Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Bureau of Reclamation, Northern California Area Office (NCAO) seeks troubleshooting and repair services for the brake system of the Shasta Dam elevator under RFQ 140R2026Q0001. The procurement is a 100% small business set-aside (WOSB) requiring qualified manufacturer/vendor personnel on-site, compliance with ASME A17.1/CSA B44, and submission of a detailed price breakout. Work will be performed at Shasta Dam for approximately 60 days from award, with quotes due by January 30, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The installation of a new elevator traction machine, control system, and brake system on the shasta dam elevator.
Posted Date
Jan 22, 2026
Due Date
Jan 31, 2026
Release: Jan 22, 2026
Close: Jan 31, 2026
The installation of a new elevator traction machine, control system, and brake system on the shasta dam elevator.
AvailableSleeve, Pressure, Actuator, PBAF, 10", Friction Brake System.
Posted Date
Dec 18, 2025
Due Date
Jan 28, 2026
Release: Dec 18, 2025
Close: Jan 28, 2026
Sleeve, Pressure, Actuator, PBAF, 10", Friction Brake System.
AvailableDemolish and remove the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings. Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete shall be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Only the hydraulic cylinders shall remain from the existing hydraulic system. Electrical demolition work shall include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work shall be required for placement of new buildings and routing of new electrical cable and mechanical pipe.
Posted Date
Dec 4, 2025
Due Date
Jan 29, 2026
Release: Dec 4, 2025
Provide mammoth lake dam outlet works sluice gate repairs; dam safety diving inspection twin lakes upper dam; dam safety diving inspection twin lakes lower dam; dam safety diving inspection acme dam.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Provide mammoth lake dam outlet works sluice gate repairs; dam safety diving inspection twin lakes upper dam; dam safety diving inspection twin lakes lower dam; dam safety diving inspection acme dam.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolish and remove the existing hydraulic system and its related components, and installation of a new hydraulic system with supporting controls and buildings. Primary hydraulic system components to be demolished and removed are motors, pumps, reservoir, filters, filter housings, piping and pipe hangers, hydraulic fluid, valves, and manifolds. Any hydraulic piping that is embedded in concrete shall be drained, cut flush with the concrete surface, capped or plugged, and abandoned in place. Only the hydraulic cylinders shall remain from the existing hydraulic system. Electrical demolition work shall include but not be limited to removal of specified buckets, cabinet doors, junction boxes, levers, buttons, indicators, limit switches, wiring, and hardware. Some concrete demolition work shall be required for placement of new buildings and routing of new electrical cable and mechanical pipe.
Available