Summary
Upper Darby Township is soliciting proposals for professional engineering services for the Naylors Run Stream Restoration and Flood Mitigation Program, including survey, geotechnical engineering, hydrologic and hydraulic analysis, environmental investigations, permitting, and final design. Proposals are to be submitted online through the PennBid portal and the RFP materials (including a named RFP PDF) are posted on the PennBid opportunity page; a non-mandatory virtual pre-bid meeting is scheduled for July 29, 2026 and questions are due July 31, 2026. The submission deadline is August 5, 2026 at 11:00 AM (EDT) and physical inspection copies are available at Upper Darby Township Public Works as noted in the posting.