Summary
Furnish all labor, equipment, and materials for conducting railroad crossing replacement. Removal and replacement of two (2) 81' precast concrete railroad crossings. Existing crossings are century precast and equal type to be furnished and installed utilizing the existing rails and newly supplied materials listed below. Ten-foot (10’) asphalt approaches at each crossing will be removed by the County before contractor begins work. Disassembly of joint bars on both sides of existing 115lb rails and remove from excavation site. Inspect rails for defects upon removal and plan to reuse 115lb. rails. Remove existing 115lb. precast concrete crossings, tie plates, spikes, bolts, anchors, and ballast. County will haul all spoils from jobsite to County landfill. Excavate track bed to a depth of 18” below bottom of the rail. Include approx. 40 tons of ABC crusher run for each crossing to help sub ballast reach 95% compaction. Contractor to purchase ABC and County will haul material to site. Proof roll sub ballast and achieve approval prior to rebuilding track. Clean up work site when finished, including regrade, reseed, and fertilize any disturbed areas.