Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
4" PE Pipe, 1,645 L.F.; 2" PE Pipe, 16,895 L.F.; 1" PE Pipe; 175 L.F.; 3/4" PE Service Line, 1,170 L.F.; 1/2" PE Service Line, 6,180 L.F.; 4" PE Valves, 7 Each; 2" PE Valves, 25 Each; 6" Steel to 4" PE Hot-Tap Connection; 1 Each; 6" CI to 4" PE Hot-Tap Connection; 1 Each; 4" PE to 4" PE Connections, 1 Each; 2" PE to 2" PE Connections, 2 Each; 2" PE to 1-1/4" PE Connections, 3 Each; 2" PE to 2-1/4" C.I. Connections, 1 Each; 2" Steel to 2" PE Hot-Tap Connection, 1 Each; 2" PE to 2" C.I. Connection, 1 Each; 2" PE to 2" Steel Connections, 2 Each; Service Reconnections, 10 Each; Service Replacements, 78 Each; and other miscellaneous necessary items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Two (2) gas chromatograph model 470xa, natural gas, 24v dc power.
Posted Date
Dec 9, 2025
Due Date
Dec 16, 2025
Release: Dec 9, 2025
Close: Dec 16, 2025
Two (2) gas chromatograph model 470xa, natural gas, 24v dc power.
Project consists of replacement of unit substation uss-4 with medium-voltage switchgear, pad mounted transformers, and 480 volt draw-out switchgear; eplacement of 7,500 kva transformer for incoming service to the facility; removal of pad mounted medium-voltage switch 200-pms-1, 200-pms-2, and 200-pms-3. See outside link.
Posted Date
Oct 28, 2025
Due Date
Jan 23, 2026
Release: Oct 28, 2025
Close: Jan 23, 2026
Project consists of replacement of unit substation uss-4 with medium-voltage switchgear, pad mounted transformers, and 480 volt draw-out switchgear; eplacement of 7,500 kva transformer for incoming service to the facility; removal of pad mounted medium-voltage switch 200-pms-1, 200-pms-2, and 200-pms-3. See outside link.
AvailableYuma County issued the 'Wellton Area Drainage Improvements Phase 2' solicitation (ID 3.1501A) for construction work to install storm drains, retention basins, and related roadway and utility work in Wellton, Yuma County, Arizona. The solicitation opens 2025-12-05 and closes 2026-01-05 at 1:30 PM MST (see dueTo). Bidders should obtain plans/specifications and submission instructions from the official Yuma County posting linked above.
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
Yuma County issued the 'Wellton Area Drainage Improvements Phase 2' solicitation (ID 3.1501A) for construction work to install storm drains, retention basins, and related roadway and utility work in Wellton, Yuma County, Arizona. The solicitation opens 2025-12-05 and closes 2026-01-05 at 1:30 PM MST (see dueTo). Bidders should obtain plans/specifications and submission instructions from the official Yuma County posting linked above.
Louisville MSD seeks bids for Phase 2 to replace existing catch basins with new trapped catch basins within Louisville’s Chickasaw neighborhood. The ITB opened on Nov 13, 2025 and bids are due Jan 8, 2026 at 2:00 PM EST via the Bonfire portal.
Posted Date
Nov 13, 2025
Due Date
Jan 8, 2026
Release: Nov 13, 2025
Close: Jan 8, 2026
Louisville MSD seeks bids for Phase 2 to replace existing catch basins with new trapped catch basins within Louisville’s Chickasaw neighborhood. The ITB opened on Nov 13, 2025 and bids are due Jan 8, 2026 at 2:00 PM EST via the Bonfire portal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis