Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will include the installation of approx. 55,000 LF of 2", 4", and 6" low pressure and intermediate pressure HDPE gas mains, approx. 500 service/meter replacements and associated appurtenances across 18 streets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project includes the Construction of wastewater treatment plant improvements and replacements including demolition of solids handling pumps, piping, and valves, and demolition of other miscellaneous items as required. Improvements include a new pavilion above UV disinfection system, replacement of chemical feed pumps, new solids handling pumps and associated piping and valves, painting of existing basement, new solids digester aeration and mixing equipment including air piping and valves, new sidewalk and parking facility, and new natural gas generator. All required appurtenances, interconnecting piping and valving, electrical improvements, and controls are included.
Posted Date
Dec 14, 2025
Due Date
Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 15, 2026
The Project includes the Construction of wastewater treatment plant improvements and replacements including demolition of solids handling pumps, piping, and valves, and demolition of other miscellaneous items as required. Improvements include a new pavilion above UV disinfection system, replacement of chemical feed pumps, new solids handling pumps and associated piping and valves, painting of existing basement, new solids digester aeration and mixing equipment including air piping and valves, new sidewalk and parking facility, and new natural gas generator. All required appurtenances, interconnecting piping and valving, electrical improvements, and controls are included.
AvailableConstruction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
AvailableConstruction management and inspection services for 2016 safe routes to school project - phase I intersection safety improvements
Posted Date
Nov 24, 2025
Due Date
Jan 8, 2026
Release: Nov 24, 2025
Close: Jan 8, 2026
Construction management and inspection services for 2016 safe routes to school project - phase I intersection safety improvements
The City of Donaldsonville is soliciting sealed bids for construction of new MDPE natural gas mains and associated service lines, including an odorant station and a regulator station, under HUD Project No. B-23-CP-LA-0626. Bidders must be pre-qualified (Operator Qualification and Training Program per 49 CFR Part 192.801 et seq.) to receive bidding documents; contract documents are on file for review at 609 Railroad Ave., Donaldsonville, LA. Sealed bids are due January 8, 2026 at 10:00 AM local time and will be publicly opened at that time.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
The City of Donaldsonville is soliciting sealed bids for construction of new MDPE natural gas mains and associated service lines, including an odorant station and a regulator station, under HUD Project No. B-23-CP-LA-0626. Bidders must be pre-qualified (Operator Qualification and Training Program per 49 CFR Part 192.801 et seq.) to receive bidding documents; contract documents are on file for review at 609 Railroad Ave., Donaldsonville, LA. Sealed bids are due January 8, 2026 at 10:00 AM local time and will be publicly opened at that time.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →