Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Greencastle
The work consists of Architectural, Structural, Mechanical (including Plumbing, Heating, Ventilation, and Sheet Metal Trades), Electrical Work, Site Work, Special Equipment (including Pool installation), Kitchen Equipment, Detention Equipment, Security Electronics and all the Work as defined on the Contract Drawings and Project Manual.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lynwood
This solicitation requests resurfacing of the Lynwood Natatorium pool, including removal of the existing interior coating, replacement or repair of damaged tiles, application of a new white pool paint finish with black lane markings, and preparation and repainting of the overflow gutter. The contractor must provide all supervision, labor, materials, equipment, and management and coordinate with the Los Angeles County Health Department to meet applicable health and safety requirements.
Posted Date
Nov 19, 2025
Due Date
Dec 22, 2025
Release: Nov 19, 2025
City of Lynwood
Close: Dec 22, 2025
This solicitation requests resurfacing of the Lynwood Natatorium pool, including removal of the existing interior coating, replacement or repair of damaged tiles, application of a new white pool paint finish with black lane markings, and preparation and repainting of the overflow gutter. The contractor must provide all supervision, labor, materials, equipment, and management and coordinate with the Los Angeles County Health Department to meet applicable health and safety requirements.
AvailableNew York Dormitory Authority
College Haaren Hall Natatorium Mechanical Room and Water Heater Phase II Upgrades.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
New York Dormitory Authority
Close: Dec 10, 2025
College Haaren Hall Natatorium Mechanical Room and Water Heater Phase II Upgrades.
AvailableCity of Cortez
Work consists of rehabilitate the concrete at the cortez recreation center natatorium slide tower. Work includes the installation and removal of temporary shoring to support structural elements vertically and install discrete galvanic anodes embedded in concrete repair or surface mounted galvanic anodes on concrete surfaces; perform batching and placement procedures for packaged concrete repair materials, concrete formwork, and finishing of concrete; establish corrosion-inhibiting coating to existing reinforcing bars and embedded steel material and perform the fabrication and installation of new epoxy-coated reinforcement as required; ensure adequate curing and protection of all concrete repairs; and the contractor must provide and properly apply traffic coating, silane water repellant, and install sealant in concrete joints
Posted Date
Oct 29, 2025
Due Date
Dec 18, 2025
Release: Oct 29, 2025
City of Cortez
Close: Dec 18, 2025
Work consists of rehabilitate the concrete at the cortez recreation center natatorium slide tower. Work includes the installation and removal of temporary shoring to support structural elements vertically and install discrete galvanic anodes embedded in concrete repair or surface mounted galvanic anodes on concrete surfaces; perform batching and placement procedures for packaged concrete repair materials, concrete formwork, and finishing of concrete; establish corrosion-inhibiting coating to existing reinforcing bars and embedded steel material and perform the fabrication and installation of new epoxy-coated reinforcement as required; ensure adequate curing and protection of all concrete repairs; and the contractor must provide and properly apply traffic coating, silane water repellant, and install sealant in concrete joints
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis