Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes trimming back the existing eaves from approximately five feet to one foot, replacing all plywood roof decking, and eliminating the drop fascia portion of the current design. The roofing system will be amended to utilize metal roofing material in place of the existing asphalt shingles, with all associated labor, materials, and installation required to provide a complete and finished roof system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 22, 2025
Close: Jan 22, 2026
County recreation complex 2025 (fencing).
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project is for full replacement of the existing ballasted EPDM roof system at the Bemidji State University PE Complex with a new gravel-surfaced built-up roof. Work includes new through-wall flashing at masonry transitions, minor modifications to roof drainage, and limited replacement of mechanical equipment at new access ladders and safety railings. Bemidji State University (part of the Minnesota State system) is soliciting contractors for this construction project; instructions and documents are available from the source posting (QuestCDN link) referenced on the aggregator page.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
The project is for full replacement of the existing ballasted EPDM roof system at the Bemidji State University PE Complex with a new gravel-surfaced built-up roof. Work includes new through-wall flashing at masonry transitions, minor modifications to roof drainage, and limited replacement of mechanical equipment at new access ladders and safety railings. Bemidji State University (part of the Minnesota State system) is soliciting contractors for this construction project; instructions and documents are available from the source posting (QuestCDN link) referenced on the aggregator page.
AvailableProvide qualified contractors for the removal of an existing railroad flat car bridge and construction of a new prefabricated steel bridge at the same location. The project includes demolition, site development, foundation construction, bridge installation, erosion control, and full site restoration in accordance with the project plans and specifications.
Posted Date
Aug 20, 2025
Due Date
Jan 22, 2026
Release: Aug 20, 2025
Close: Jan 22, 2026
Provide qualified contractors for the removal of an existing railroad flat car bridge and construction of a new prefabricated steel bridge at the same location. The project includes demolition, site development, foundation construction, bridge installation, erosion control, and full site restoration in accordance with the project plans and specifications.
AvailableProvide the removal of an existing railroad flat car bridge and construction of a new prefabricated steel bridge at the same location. The project includes demolition, site development, foundation construction, bridge installation, erosion control, and full site restoration in accordance with the project plans and specifications.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Provide the removal of an existing railroad flat car bridge and construction of a new prefabricated steel bridge at the same location. The project includes demolition, site development, foundation construction, bridge installation, erosion control, and full site restoration in accordance with the project plans and specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →