FederalDC
Posted
Jan 21, 2026
Nov 25, 2026
Procurement of Design and Production of Flat Railcars-psc 2220- Naics 336510
Procurement of design and production of flat railcars.
Description: The Department of the Navy’s NSWC Crane is soliciting proposals for the design and production of flat railcars. The latest amendment updates the Statement of Work and reduces the number of Contract Data Requirement Lists. The solicitation remains active, with proposals due November 25, 2026, at 2:00 p.m. EST.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalDC
Posted
Jan 21, 2026
Nov 25, 2026
Procurement of design and production of flat railcars.
University Of Arkansas At Pine Bluff
Higher EducationAR
Posted
Oct 25, 2026
Dec 1, 2026
Seeks to contract with a qualified contractor to provide professional multimedia production development, merging various types of arts, projection technology, and live performance to create immersive environments to advance the university of arkansas at pine bluff s multimedia art experience. The work will integrate digital art, projection mapping, sound design, and live-performance based media to create immersive artistic and instructional environments.
FederalMS
Posted
Nov 16, 2026
Nov 23, 2026
Requirements Specifications: Design of Tooling: The target process should integrate industrial state-of-the-art forming of sheet metal. Acceptable approaches include sheet hydroforming (e.g. fluid cell / hydro-mechanical deep drawing), conventional deep drawing, and hard tooled die forming in progressive, compound, or transfer dies of the type used to produce cold formed sheet steel structural connectors. Offerors are to propose the approach best suited to the part geometry and the production volumes stated below; forming method is not prescribed. A goal of this work is to set a benchmark for production speed and cost if the process proves viable. Cold forming of steel structural connectors common to building construction is considered the most likely fit for this part geometry and these production volumes and is the reference case against which production rate and per-part cost will be compared. Warm or hot forming is not excluded (for example warm deep drawing, or hot metal gas forming of steel or titanium), provided the offeror states the forming temperature and how it is reached and held, the material and coating system compatible with it, and the consequences for cycle time, energy consumption, equipment cost, and per-part cost in sustained volume production. Proposals are to state the intended process, the cycle time, and the degree of automation assumed at the production rate proposed (e.g. coil or blank feeding, de-stacking, inter-station transfer, and part ejection). See attached file.
CityNM
Posted
Nov 8, 2026
Nov 25, 2026
Professional engineering services to evaluate, design, and support the upgrade of the radio communications system serving approximately 50 Water Production facilities.
Decision makers connected to this RFP from Department of the Navy.