Retrieving RFP details
Release
Close
Massachusetts Water Resources Authority
Make-up air handling units replacement.
8151
Massachusetts Water Resources Authority
Work includes demolition and replacement of the two, existing make-up air handling units that operate continuously.
261P - NETWORK CONTRACT OFC21 (00261P)
Perform air filter replacement of HVAC Air Handling Units (AHU) on 96 Air Handling Units.
Hingham Public Schools
Removal and replacement of two (2) HVAC AHU units located in the interior of the building and two (2) ACCU units are located are on the roof. All replacement equipment will be placed where the existing equipment is currently located. Work will include removal and replacement of equipment along with all associated mechanical, electrical, carpentry, insulation, building management/sensors, ductwork, fire protection, water proofing, damproofing and wiring.
Release
Nov 12, 2025
Close
Jan 07, 2026