Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacing approx 7,591 LF of aging 24" ductile iron water pipe with 24" pvc water pipe, installation of miscellaneous valves, fittings, connections, tie-ins, and surface restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Premium
Access the largest public sector contact database
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
AvailableUnit Price Lead Service Line Replacement.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Close: Dec 17, 2025
Unit Price Lead Service Line Replacement.
AvailableWork consists of Waterline replacement pipe and tracer wire Pymatuning State Park. Includes 440 LF of 6" C-900 pipe, 20' lengths; 500' of tracer wire suitable for water line use.
Posted Date
Dec 9, 2025
Due Date
Dec 16, 2025
Release: Dec 9, 2025
Close: Dec 16, 2025
Work consists of Waterline replacement pipe and tracer wire Pymatuning State Park. Includes 440 LF of 6" C-900 pipe, 20' lengths; 500' of tracer wire suitable for water line use.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis