CityTX
Posted
Aug 31, 2026
Sep 22, 2026
TWDB CWSRF Wastewater Treatment Plant Improvements
Improvements to the existing city's wastewater treatment plant.
Description: Cameron County Drainage District No. 5 is soliciting sealed bids for construction of two regional detention ponds near Primera, Texas. The work includes concrete weir outfalls, erosion and sedimentation controls, and revegetation of disturbed areas. Although the project is associated with Texas Water Development Board Flood Infrastructure Fund financing, this is an open construction procurement rather than a grant-program application, and bids are due September 30, 2026 at 12:00 PM.
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Cameron County Drainage District 5.
Adjacent opportunities open for bidding right now.
CityTX
Posted
Aug 31, 2026
Sep 22, 2026
Improvements to the existing city's wastewater treatment plant.
CityMO
Posted
Aug 17, 2026
Sep 22, 2026
Procurement of services for a Residential Sanitary Sewer Lateral Repair Project, with an option to renew for 4 subsequent years.
CountyOH
Posted
-
Sep 23, 2026
Work includes replacement of ahu's 2,4,5,7 & 8 & associated piping systems; environmental controls conversion from pneumatic to ddc & integration into the jail's environmental controls system; electrical distribution upgrades; detention lighting replacements; water control system updates; low voltage security and communication systems updates; reconfiguration of existing cells into functional medical exam rooms, mental health treatment rooms, and counseling rooms; installation of detention grade furnishings; modification of existing cell doors to integrate food ports; retrofitting stainless steel shower inserts & seamless coatings; installation of anti-jump netting on second floor balconies & stair sections.
CountyVA
Posted
Jul 17, 2026
Sep 22, 2026
Provide, furnish, deliver, supply, and install all necessary or appropriate labor, services, parts, tools, materials, equipment, items and resources as may be required to complete the transitional shelter generator project.