CityNJ
Posted
Sep 18, 2026
Oct 1, 2026
Municipal Building Parking Lot Resurfacing
Work includes 750 SY profile milling 0"-3"; 785 ton 9.5m64 hot mix asphalt overlay, 3" thick; 850 SY remove and replace parking lot base; 125 ton remove and replace parking lot base, additional depth; 1 LS pavement striping; 1 LS pavement markings; 6 EA reset monitoring well casting; 3 EA reset septic force main cleanout casting; 3 EA valve box riser; 1 EA 1" inlet riser, type a; 450 SY hma leveling course, variable thickness; 3 EA install new septic force main cleanout casting (if and where directed); 6 EA install new monitoring well casting (if and where directed). See outside link.
