Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 96 LF sawing bituminous pavement (full depth); 380 TN aggregate surfacing class 5; 9,996 SY full depth reclamation; 13,840 SY mill bituminous surface (2.0"); 743 GAL bituminous material for tack coat; 600 LF 4" solid line multi-component; 12 LF 24" solid line preform tape ground in; 173 CY excavation - rock; 1,154 TN aggregate surfacing class 5; 22,808 SY full depth reclamation; 2 EA 12" cas pipe apron; 1,127 SF 4" concrete walk; 472 LF concrete curb & gutter design d418; 56 LF wooden fence.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide grading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
Posted Date
Nov 20, 2025
Due Date
Jan 8, 2026
Release: Nov 20, 2025
Close: Jan 8, 2026
Provide grading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
AvailableWork includes 48 LF sawing bituminous pavement (full depth); 1,758 CY excavation - common (p); 1 LS dewatering; 71 CY aggregate surfacing (cv) class 5 (p); 554 cy aggregate base (cv) class 5 (p); 54 LF 12x8 precast concrete box culvert; 34 LF 12" cas pipe culvert; 32 CY random riprap class iii; 1 LS erosion control supervisor; 120 LF interim pavement marking; 120 LF 4" broken line paint.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes 48 LF sawing bituminous pavement (full depth); 1,758 CY excavation - common (p); 1 LS dewatering; 71 CY aggregate surfacing (cv) class 5 (p); 554 cy aggregate base (cv) class 5 (p); 54 LF 12x8 precast concrete box culvert; 34 LF 12" cas pipe culvert; 32 CY random riprap class iii; 1 LS erosion control supervisor; 120 LF interim pavement marking; 120 LF 4" broken line paint.
Work includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
Provide bituminous milling, bituminous shouldering, concrete paving. Estimated Major Quantities are: 83,500 SY 6” Concrete Paving, 88,000 SY Bituminous Milling, and 55,000 SY of 3” Thick Bituminous Mixture.
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Provide bituminous milling, bituminous shouldering, concrete paving. Estimated Major Quantities are: 83,500 SY 6” Concrete Paving, 88,000 SY Bituminous Milling, and 55,000 SY of 3” Thick Bituminous Mixture.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis