Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 48 LF sawing bituminous pavement (full depth); 1,758 CY excavation - common (p); 1 LS dewatering; 71 CY aggregate surfacing (cv) class 5 (p); 554 cy aggregate base (cv) class 5 (p); 54 LF 12x8 precast concrete box culvert; 34 LF 12" cas pipe culvert; 32 CY random riprap class iii; 1 LS erosion control supervisor; 120 LF interim pavement marking; 120 LF 4" broken line paint.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Grading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
Grading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
AvailablePremium
Access the largest public sector contact database
Work includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
AvailableWork includes 660 SY sawing bituminous pavement (full depth); 816 CY excavation - common (p); 1,887 TN aggregate surfacing class 5; 2,529 GAL bituminous material for tack coat; 15,515.50 LF interim pavement marking; 18 LF 24" solid line multi-component; 2,212. 50 LF 6" broken line multi-component; 4,449 LF 6" double solid line multi-component; pavement message multi-component; 412 LF sawing bituminous pavement (full depth); 23,451. 50 LF interim pavement marking; 36 LF 24" solid line multi-component; 15,490 SY mill gravel surface; 959 GAL bituminous material for tack coat; 4,380 LF interim pavement marking; 12 LF 24" solid line multi-component.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work includes 660 SY sawing bituminous pavement (full depth); 816 CY excavation - common (p); 1,887 TN aggregate surfacing class 5; 2,529 GAL bituminous material for tack coat; 15,515.50 LF interim pavement marking; 18 LF 24" solid line multi-component; 2,212. 50 LF 6" broken line multi-component; 4,449 LF 6" double solid line multi-component; pavement message multi-component; 412 LF sawing bituminous pavement (full depth); 23,451. 50 LF interim pavement marking; 36 LF 24" solid line multi-component; 15,490 SY mill gravel surface; 959 GAL bituminous material for tack coat; 4,380 LF interim pavement marking; 12 LF 24" solid line multi-component.
AvailableWork includes approx 1 LS clearing and grubbing; 21,145 CY common excavation; 88 LF 36" entrance pipe; 500 LF steel plate guardrail; 24,841 SY erosion control type C class 1; 820 SY bridge deck grooving; 1,700 LF fence (barbed wire) temporary; 14,952 LF 6" pavement marking (white) (multi-component). See attached file.
Posted Date
Nov 20, 2025
Due Date
Dec 17, 2025
Release: Nov 20, 2025
Close: Dec 17, 2025
Work includes approx 1 LS clearing and grubbing; 21,145 CY common excavation; 88 LF 36" entrance pipe; 500 LF steel plate guardrail; 24,841 SY erosion control type C class 1; 820 SY bridge deck grooving; 1,700 LF fence (barbed wire) temporary; 14,952 LF 6" pavement marking (white) (multi-component). See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis