Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1 LS clearing and grubbing; 21,145 CY common excavation; 88 LF 36" entrance pipe; 500 LF steel plate guardrail; 24,841 SY erosion control type C class 1; 820 SY bridge deck grooving; 1,700 LF fence (barbed wire) temporary; 14,952 LF 6" pavement marking (white) (multi-component). See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 48 LF sawing bituminous pavement (full depth); 1,758 CY excavation - common (p); 1 LS dewatering; 71 CY aggregate surfacing (cv) class 5 (p); 554 cy aggregate base (cv) class 5 (p); 54 LF 12x8 precast concrete box culvert; 34 LF 12" cas pipe culvert; 32 CY random riprap class iii; 1 LS erosion control supervisor; 120 LF interim pavement marking; 120 LF 4" broken line paint.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes 48 LF sawing bituminous pavement (full depth); 1,758 CY excavation - common (p); 1 LS dewatering; 71 CY aggregate surfacing (cv) class 5 (p); 554 cy aggregate base (cv) class 5 (p); 54 LF 12x8 precast concrete box culvert; 34 LF 12" cas pipe culvert; 32 CY random riprap class iii; 1 LS erosion control supervisor; 120 LF interim pavement marking; 120 LF 4" broken line paint.
AvailableGrading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
Posted Date
Nov 20, 2025
Due Date
Jan 8, 2026
Release: Nov 20, 2025
Close: Jan 8, 2026
Grading, bituminous surfacing, concrete surfacing, signals, and ADA improvements.
AvailableWork includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
Posted Date
Dec 12, 2025
Due Date
Jan 8, 2026
Release: Dec 12, 2025
Close: Jan 8, 2026
Work includes 2,608 CY excavation - common (p); 73 CY aggregate surfacing (cv) class 6; 68 GAL bituminous material for tack coat; 9 LF construct drainage structure design n; 7 LF construct drainage structure design 48-4020; 27 CY random riprap class ii; 560 SF 6" concrete walk; 790 SF 7" concrete walk special; 258 SF concrete curb ramp walk; 1 LS lighting system; 622 SF sign; 1. 10 acre seeding; 560 LF 6" broken line multi-component ground in (wr); 270 SF pavement message preform thermoplastic ground in.
AvailableWork includes 660 SY sawing bituminous pavement (full depth); 816 CY excavation - common (p); 1,887 TN aggregate surfacing class 5; 2,529 GAL bituminous material for tack coat; 15,515.50 LF interim pavement marking; 18 LF 24" solid line multi-component; 2,212. 50 LF 6" broken line multi-component; 4,449 LF 6" double solid line multi-component; pavement message multi-component; 412 LF sawing bituminous pavement (full depth); 23,451. 50 LF interim pavement marking; 36 LF 24" solid line multi-component; 15,490 SY mill gravel surface; 959 GAL bituminous material for tack coat; 4,380 LF interim pavement marking; 12 LF 24" solid line multi-component.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Work includes 660 SY sawing bituminous pavement (full depth); 816 CY excavation - common (p); 1,887 TN aggregate surfacing class 5; 2,529 GAL bituminous material for tack coat; 15,515.50 LF interim pavement marking; 18 LF 24" solid line multi-component; 2,212. 50 LF 6" broken line multi-component; 4,449 LF 6" double solid line multi-component; pavement message multi-component; 412 LF sawing bituminous pavement (full depth); 23,451. 50 LF interim pavement marking; 36 LF 24" solid line multi-component; 15,490 SY mill gravel surface; 959 GAL bituminous material for tack coat; 4,380 LF interim pavement marking; 12 LF 24" solid line multi-component.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis