Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
St. Louis County
Work includes 660 SY sawing bituminous pavement (full depth); 816 CY excavation - common (p); 1,887 TN aggregate surfacing class 5; 2,529 GAL bituminous material for tack coat; 15,515.50 LF interim pavement marking; 18 LF 24" solid line multi-component; 2,212. 50 LF 6" broken line multi-component; 4,449 LF 6" double solid line multi-component; pavement message multi-component; 412 LF sawing bituminous pavement (full depth); 23,451. 50 LF interim pavement marking; 36 LF 24" solid line multi-component; 15,490 SY mill gravel surface; 959 GAL bituminous material for tack coat; 4,380 LF interim pavement marking; 12 LF 24" solid line multi-component.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
St. Louis County
Work includes 92 LF sawing bituminous pavement (full depth); 6,438 SY remove bituminous pavement; 25 TN aggregate surfacing class 5; 250 TN aggregate base class 5; 387 GAL bituminous material for tack coat; 1,543 TN type sp 12.5 wearing course mixture (3,c); 85 LF 2" non-metallic conduit; 2,962 LF interim pavement marking.
Posted Date
Nov 7, 2025
Due Date
Dec 4, 2025
Release: Nov 7, 2025
St. Louis County
Close: Dec 4, 2025
Work includes 92 LF sawing bituminous pavement (full depth); 6,438 SY remove bituminous pavement; 25 TN aggregate surfacing class 5; 250 TN aggregate base class 5; 387 GAL bituminous material for tack coat; 1,543 TN type sp 12.5 wearing course mixture (3,c); 85 LF 2" non-metallic conduit; 2,962 LF interim pavement marking.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
St. Louis County
Work includes 54 LF sawing bituminous pavement (full depth); 458 LF salvage guardrail; 1,562 CY excavation - common (p); 581 CY select granular embankment (cv) (p); 40 CY aggregate surfacing (cv) class 5 (p); 447 CY aggregate base (cv) class 5 (p); 54 LF 12x7 precast concrete box culvert; 122 cy coarse aggregate bedding (cv) (p); 826 CY culvert excavation class u (p); 630 CY random riprap class iii; 316 CY common topsoil borrow; 0.78 acre seeding; 900 LF 6" solid line paint.
Posted Date
Nov 7, 2025
Due Date
Dec 4, 2025
Release: Nov 7, 2025
St. Louis County
Close: Dec 4, 2025
Work includes 54 LF sawing bituminous pavement (full depth); 458 LF salvage guardrail; 1,562 CY excavation - common (p); 581 CY select granular embankment (cv) (p); 40 CY aggregate surfacing (cv) class 5 (p); 447 CY aggregate base (cv) class 5 (p); 54 LF 12x7 precast concrete box culvert; 122 cy coarse aggregate bedding (cv) (p); 826 CY culvert excavation class u (p); 630 CY random riprap class iii; 316 CY common topsoil borrow; 0.78 acre seeding; 900 LF 6" solid line paint.
AvailableFillmore County
Full depth reclamation, bituminous surfacing, aggregate shouldering and striping.
Posted Date
Nov 10, 2025
Due Date
Dec 8, 2025
Release: Nov 10, 2025
Fillmore County
Close: Dec 8, 2025
Full depth reclamation, bituminous surfacing, aggregate shouldering and striping.
AvailableDakota County
Work includes approx 36,041 SY 2.5" mill bituminous surface; 9,028 TN type SP 12.5 wearing course mix; 40,951 LF of 4" and 6" multi comp. See outside link.
Posted Date
Oct 28, 2025
Due Date
Nov 25, 2025
Release: Oct 28, 2025
Dakota County
Close: Nov 25, 2025
Work includes approx 36,041 SY 2.5" mill bituminous surface; 9,028 TN type SP 12.5 wearing course mix; 40,951 LF of 4" and 6" multi comp. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →