Retrieving RFP details
Release
Close
Millard Public Schools
High school baseball and softball field improvements.
Millard Public Schools
Work includes 3,570 SF construct 5" thick PC concrete; 1,140 LF construct bottom rail on existing chain link gate; 365 SF construct segmental retaining wall; 1,840 LF construct 12" x 1" flat drain lateral with fabric; 920 LF construct 12" perforated collector pipe with fittings and gravel fill pipe bedding; 1 EA. construct 15" storm sewer tap; 1 EA. construct 8" storm sewer tap; 5,050 SY subgrade preparation; 720 LF construct 12" x 10" reinforced PC concrete curb; 205 LF construct 8" storm sewer with pipe bedding.
Millard Public Schools
Work includes 1,500 LF construct 12" perforated collector pipe with fittings and gravel fill pipe bedding; 3,900 LF construct 12" perforated collector pipe with fittings and gravel fill pipe bedding; 1,895 LF construct 15" storm sewer with pipe bedding; 1,110 LF construct 12" x 10" reinforced PC concrete curb; 370 LF construct 12" x 8" reinforced PC concrete curb; 290 LF construct 72" chain link fence with salvaged yellow corrugated PVC top cap; 1,050 construct bottom rail on existing fence; 2,870 SF construct 5" thick PC concrete.
City of Pearland
Baseball and softball field lighting system upgrade.
Release
-
Close
Nov 13, 2025