Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking bids from qualified contractors for roadway and associated infrastructure improvements for its Moore Street and Valley Street Phase 1 Infrastructure Improvements. Project, which consists of removal and replacement of 475 LFof sewer main, manholes and laterals, 550 LF of water main, service connections, fire hydrants, gate valves, full depth road construction, and all associated work for Valley Street (east) and the northern portion of Moore Street.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of services and materials for the Huntwick II Stormwater Infrastructure Improvements Phase 1 Project.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Procurement of services and materials for the Huntwick II Stormwater Infrastructure Improvements Phase 1 Project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Local aid infrastructure fund resurfacing of street.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
Local aid infrastructure fund resurfacing of street.
AvailableWork includes 1 allowance gas main relocation utility support; 6 EA mbta electric manhole frame and cover adjustments; 198 EA external building inspection; 18 ea external building inspection; 1 LS erosion and sedimentation control; 4,000 TON disposal of construction debris as solid waste; 12,200 TON disposal of bituminous concrete; 58 EA demolition or removal of manhole, catch basin or other structure; 27 EA abandon-in-place manhole, catch basin or other structure; 20 CY abandon-in-place with cellular concrete - pipe 15" or larger; 1,427 LF demolition or removal of concrete brick pipe 15" to 24" dia. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Work includes 1 allowance gas main relocation utility support; 6 EA mbta electric manhole frame and cover adjustments; 198 EA external building inspection; 18 ea external building inspection; 1 LS erosion and sedimentation control; 4,000 TON disposal of construction debris as solid waste; 12,200 TON disposal of bituminous concrete; 58 EA demolition or removal of manhole, catch basin or other structure; 27 EA abandon-in-place manhole, catch basin or other structure; 20 CY abandon-in-place with cellular concrete - pipe 15" or larger; 1,427 LF demolition or removal of concrete brick pipe 15" to 24" dia. See attached file.
AvailableIntersection improvements for the South 9th Street and Washington Street intersection, including expansion to 5-lanes, new sidewalks, ADA-compliant curb ramps, traffic signals, pavement striping, signing, milling, and full depth asphalt construction.
Posted Date
Dec 30, 2025
Due Date
Jan 20, 2026
Release: Dec 30, 2025
Close: Jan 20, 2026
Intersection improvements for the South 9th Street and Washington Street intersection, including expansion to 5-lanes, new sidewalks, ADA-compliant curb ramps, traffic signals, pavement striping, signing, milling, and full depth asphalt construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →