Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of HMA surface removal, HMA resurfacing, sidewalk ramp construction, removal and replacement of deteriorated concrete curb and gutter and driveway pavement, drainage improvements, aggregate base course, installation of pavement markings, seeding and all other items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
HMA Resurfacing.
Posted Date
Dec 18, 2025
Due Date
Jan 20, 2026
Release: Dec 18, 2025
Close: Jan 20, 2026
HMA Resurfacing.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 14,239 ton base widening, hot mix asphalt mixture; 192,751 SY pavement scarification, nominal thickness; 25,667 ton hot mix asphalt standard traffic, intermediate course, 1/2" Mix; 3,241 ton asphalt binder, PG 58-28S, standard traffic; 2 EA. Rumble strip panel (HMA surface); 741.720 STA grooves cut for pavement markings; 13,796 ton granular shoulders, type A; 738.7 STA milled shoulder rumble strips HMA surface.
Posted Date
Dec 18, 2025
Due Date
Jan 21, 2026
Release: Dec 18, 2025
Close: Jan 21, 2026
Work includes 14,239 ton base widening, hot mix asphalt mixture; 192,751 SY pavement scarification, nominal thickness; 25,667 ton hot mix asphalt standard traffic, intermediate course, 1/2" Mix; 3,241 ton asphalt binder, PG 58-28S, standard traffic; 2 EA. Rumble strip panel (HMA surface); 741.720 STA grooves cut for pavement markings; 13,796 ton granular shoulders, type A; 738.7 STA milled shoulder rumble strips HMA surface.
AvailableWork includes 633.6 SY pavement scarification nominal thickness; 10,066.8 ton hot mix asphalt standard traffic, intermediate course, 1/2". Mix; 4 EA. Rumble strip panel (HMA surface); 536.1 STA ainted pavement markings, waterborne or solvent-based; 570.6 STA painted pavement markings, high-build waterborne; 570.6 STA grooves cut for pavement markings.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work includes 633.6 SY pavement scarification nominal thickness; 10,066.8 ton hot mix asphalt standard traffic, intermediate course, 1/2". Mix; 4 EA. Rumble strip panel (HMA surface); 536.1 STA ainted pavement markings, waterborne or solvent-based; 570.6 STA painted pavement markings, high-build waterborne; 570.6 STA grooves cut for pavement markings.
AvailableWork includes 6,700 CY excavation, class 13, roadway and borrow; 1,467 SY patches, full-depth repair; 70 EA. patches by count (repair); 43,648 LF subdrain, logitudinal, (shoulder) 4" dia.; 798.9 STA painted pavement markings, waterborne or solvent-based; 100 EA. flaggers; 20 EA. remove and reinstall sign as per plan; 32,700 SY engineering fabric; 16,420 EA. pavement adjustment incentive/disincentive for HMA mixture field voids (formula- by pay factor).
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Work includes 6,700 CY excavation, class 13, roadway and borrow; 1,467 SY patches, full-depth repair; 70 EA. patches by count (repair); 43,648 LF subdrain, logitudinal, (shoulder) 4" dia.; 798.9 STA painted pavement markings, waterborne or solvent-based; 100 EA. flaggers; 20 EA. remove and reinstall sign as per plan; 32,700 SY engineering fabric; 16,420 EA. pavement adjustment incentive/disincentive for HMA mixture field voids (formula- by pay factor).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →