Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide modular bioreactor system for parallel processing and testing of growth conditions for bacterial and mammalian cell species.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 11, 2026
Close: Jan 26, 2026
Rj45 8-pin Modular,
AvailableProvide 91 OG Modular Walls. Wall 1 - 28ft 8in X 10' high drop ceiling 1 EA. Wall 1 - 15ft 8in X 10' high drop ceiling 1 EA. Wall 1 - 11ft 2in X 10' high drop ceiling 1 EA.
Posted Date
Jan 13, 2026
Due Date
Jan 27, 2026
Release: Jan 13, 2026
Close: Jan 27, 2026
Provide 91 OG Modular Walls. Wall 1 - 28ft 8in X 10' high drop ceiling 1 EA. Wall 1 - 15ft 8in X 10' high drop ceiling 1 EA. Wall 1 - 11ft 2in X 10' high drop ceiling 1 EA.
AvailableApprox 237 CY Common excavation (ev) (p); 46 CY controlled fill (lv); 237 CY hardwood mulch; 80 LF 8" perforated dual wall pipe; 100 LF 8" non-perforated heavy duty corrugated tile; 178 SY 6 mil plastic sheeting; 222 SY geotextile fabric (MNDOT type 1, non woven); 1 ea stop log structure; etc.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
Close: Jan 30, 2026
Approx 237 CY Common excavation (ev) (p); 46 CY controlled fill (lv); 237 CY hardwood mulch; 80 LF 8" perforated dual wall pipe; 100 LF 8" non-perforated heavy duty corrugated tile; 178 SY 6 mil plastic sheeting; 222 SY geotextile fabric (MNDOT type 1, non woven); 1 ea stop log structure; etc.
AvailablePurchase of a modular vehicular barricade system for use during downtown events and temporary street closures.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Release: Jan 16, 2026
Close: Feb 13, 2026
Purchase of a modular vehicular barricade system for use during downtown events and temporary street closures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis