Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace two fish barrier culverts with a deck bulb tee girder bridge and a contractor designed aluminum structural plate single radius arch culvert and associated roadwork. Work also includes to: temporary stream diversion, contractor designed welded wire walls, construction dewatering, clearing & grubbing, excavation, streambed construction, paving, guardrail, and pavement markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Culvert replacements & rehabilitations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Culvert replacements & rehabilitations.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
State Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
Posted Date
Aug 21, 2025
Due Date
Sep 10, 2026
Release: Aug 21, 2025
Close: Sep 10, 2026
State Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
AvailableWork includes sediment and turbidity control, pollution prevention, clearing and grubbing, on-site relocation of existing sabal palm trees, maintenance of traffic, dewatering, installing 48" rcp and five manholes structures, cutting into and connecting to existing street drainage pipe and canal culvert pipes, demolition and restoration of pavement and curbs, pavement milling and resurfacing, restoration of pavement markings, irrigation system repairs, sodding.
Posted Date
Dec 22, 2025
Due Date
Feb 2, 2026
Release: Dec 22, 2025
Close: Feb 2, 2026
Work includes sediment and turbidity control, pollution prevention, clearing and grubbing, on-site relocation of existing sabal palm trees, maintenance of traffic, dewatering, installing 48" rcp and five manholes structures, cutting into and connecting to existing street drainage pipe and canal culvert pipes, demolition and restoration of pavement and curbs, pavement milling and resurfacing, restoration of pavement markings, irrigation system repairs, sodding.
AvailableWork includes 1 AC of clearing and grubbing; 2,886 CY of unclassified excavation; 1,750 CY of compacting embankment; 1,712 SY of 6" thick type 5 aggregate for base; see attached files.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Work includes 1 AC of clearing and grubbing; 2,886 CY of unclassified excavation; 1,750 CY of compacting embankment; 1,712 SY of 6" thick type 5 aggregate for base; see attached files.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →