Zone 7 Water Agency, through its Progressive Design-Build prime contractor Garney Pacific, Inc., is soliciting subcontractor bids for Early Work Package 1 — Electrical Equipment on the Mocho PFAS Treatment Plant project. Early Work Package 1 is being procured during the design phase to support the project's accelerated schedule and to allow long-lead primary electrical equipment (Switchgear and Switchboard Apparatus Manufacturing, NAICS 335313) to be solicited, evaluated, awarded, and released for fabrication before the full construction design package is complete. The procurement is open to subcontractors and subconsultants, with bids due July 27, 2026.