Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Contractor's dredge and attendant plant will primarily be used in connection with the construction and possible maintenance of a saltwater barrier sill located between Mile 63.0 and Mile 64.0 Above Head of Passes (AHP) on the Mississippi. The work will consist of satisfactorily placing hydraulically dredged material which shall be taken from a borrow area located on the river bottom. The contract plates show the approximate location of the sill and configuration of the sill (should the sill need to be built to -30’ LWRP with a 620’ notch to -55’ LWRP) and borrow areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Contractor's dredge and attendant plant will primarily be used in connection with the construction and possible maintenance of a saltwater barrier sill located between Mile 63.0 and Mile 64.0. The work will consist of satisfactorily placing hydraulically dredged material which shall be taken from a borrow area located on the river bottom. The contract plates show the approx. location of the sill and configuration of the sill (should the sill need to be built to -30’ LWRP with a 620’ notch to -55’ LWRP) and borrow areas. Further details of the location, size, and configuration of the sill and borrow area required will be given in the dredging assignments.
Posted Date
May 12, 2025
Due Date
Jul 21, 2027
Release: May 12, 2025
Close: Jul 21, 2027
The Contractor's dredge and attendant plant will primarily be used in connection with the construction and possible maintenance of a saltwater barrier sill located between Mile 63.0 and Mile 64.0. The work will consist of satisfactorily placing hydraulically dredged material which shall be taken from a borrow area located on the river bottom. The contract plates show the approx. location of the sill and configuration of the sill (should the sill need to be built to -30’ LWRP with a 620’ notch to -55’ LWRP) and borrow areas. Further details of the location, size, and configuration of the sill and borrow area required will be given in the dredging assignments.
AvailableMississippi River, New Orleans Harbor Cutterhead Dredge No. 2-2025.
Posted Date
Mar 27, 2025
Due Date
May 10, 2027
Release: Mar 27, 2025
Close: May 10, 2027
Mississippi River, New Orleans Harbor Cutterhead Dredge No. 2-2025.
AvailableThe work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge. Work will be performed in the New Orleans Harbor Reach of the Mississippi River and adjacent lock forebays of the Gulf Intracoastal Waterway.
Posted Date
Apr 22, 2025
Due Date
Apr 21, 2027
Release: Apr 22, 2025
Close: Apr 21, 2027
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge. Work will be performed in the New Orleans Harbor Reach of the Mississippi River and adjacent lock forebays of the Gulf Intracoastal Waterway.
AvailableThe work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge. Work will be performed in the New Orleans Harbor Reach of the River and adjacent lock forebays of the Gulf Intracoastal Waterway.
Posted Date
Apr 22, 2025
Due Date
Apr 21, 2027
Release: Apr 22, 2025
Close: Apr 21, 2027
The work consists of furnishing one fully crewed and equipped hydraulic pipeline cutterhead dredge. Work will be performed in the New Orleans Harbor Reach of the River and adjacent lock forebays of the Gulf Intracoastal Waterway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis