Summary
Work includes random clearing, removal of asphalt paved shoulders, all depths 234 SY, removal of concrete pavement w/ variable depth overlay 1941 SY, removal of delineator, all types 60 EA, removal of guard rail, including rails, posts and terminal ends 2219 LF, removal of sign 108 EA, removal of sign including post & footing 95 EA, removal of traffic stripe 894 LF, excess excavation, fm, ah 100 CY, granular material, class 5, group d for guardrail 50 ton, guard rail, bridge end section, type f 2 EA, additional construction signs ($10.00), temporary traffic stripe, continuous white 42 mile. See attached file.