Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Madison, Alabama is soliciting sealed bids for the Mill Ditch (South Side) erosion correction project to stabilize the south side of Mill Creek from the Balch Road/Mill Road intersection east to the bridge; work includes installation of Pyramat Turf Reinforcement Mat with specified anchors and coordination with local utilities. Bids are due January 28, 2026 at 2:00 p.m. local time, with an optional pre-bid conference on January 14, 2026 at 2:00 p.m.; the project must be completed within 90 calendar days from notice to proceed and work is to be performed 7:00 a.m. to 7:00 p.m. to minimize traffic impact. This is an Invitation to Bid (ITB) issued by the City of Madison (a municipal contracting opportunity), not a grant, and the solicitation is listed as open and active with the official posting on the City of Madison procurement portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Mill Ditch Erosion Correction (South Side) project. This erosion stabilisation project will be completed along the south side of Mill Creek beginning atthe Balch Road and Mill Road intersection extending east to the bridge. Stabilisation TRM (Pyramat) is to be installed per manufacturer recommendations with one foot and three foot anchors.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Provide Mill Ditch Erosion Correction (South Side) project. This erosion stabilisation project will be completed along the south side of Mill Creek beginning atthe Balch Road and Mill Road intersection extending east to the bridge. Stabilisation TRM (Pyramat) is to be installed per manufacturer recommendations with one foot and three foot anchors.
AvailableThe Illinois Department of Transportation (Region 3, District 5) is seeking bids for a culvert replacement project. This project is located at a ditch 0.4 mile south of US 136 in Heyworth, McLean County, along Old US 51. The scope of work includes culvert replacement, earthwork, pavement patching, HMA shoulders, erosion control, and markings, with a contract duration of 55 working days. This is an active highway construction letting, not a grant, with a due date of January 16, 2026.
Posted Date
Dec 5, 2025
Due Date
Jan 16, 2026
Release: Dec 5, 2025
Close: Jan 16, 2026
The Illinois Department of Transportation (Region 3, District 5) is seeking bids for a culvert replacement project. This project is located at a ditch 0.4 mile south of US 136 in Heyworth, McLean County, along Old US 51. The scope of work includes culvert replacement, earthwork, pavement patching, HMA shoulders, erosion control, and markings, with a contract duration of 55 working days. This is an active highway construction letting, not a grant, with a due date of January 16, 2026.
Construction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
Posted Date
Dec 13, 2025
Due Date
Jan 13, 2026
Release: Dec 13, 2025
Close: Jan 13, 2026
Construction of intersection improvements at 980 South Mill Road, Heber City, Utah. This includes removal of existing asphalt, curb and gutter, and sidewalk; installation of new curb and gutter, sidewalk improvements, and pedestrian crossing infrastructure; traffic calming measures; and re-striping of crosswalks, driving, and bike lanes.
AvailableProcurement of materials, machinery, equipment, labor, and services for improvements to the South Side 36" Interceptor for the Utilities Department.
Posted Date
Jan 6, 2026
Due Date
Jan 29, 2026
Release: Jan 6, 2026
Close: Jan 29, 2026
Procurement of materials, machinery, equipment, labor, and services for improvements to the South Side 36" Interceptor for the Utilities Department.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis